Well things are moving along, even on a bumpy road!
The roof is complete, the exterior doors and windows are in and the shell is wrapped!
http://img.photobucket.com/albums/v473/tukwut/IMG_0142_1.jpg
and I was requested to post a pic with me in it for perspective...
http://img.photobucket.com/albums/v473/tukwut/IMG_0154_1.jpg
Some of the big news, we purchased a 5th wheel to have a friend stay on site and guard it for us...
http://img.photobucket.com/albums/v473/tukwut/IMG_0038_1.jpg
And this past week, we got the 3/0 main feed in conduit in the ground and run from the 400amp main panel to the 200amp panel on the house....
http://img.photobucket.com/albums/v473/tukwut/IMG_0179.jpg
That is some thick nasty cable and at nearly 600 total feet, not cheap! It's three runs at 190 feet and one #4 as the ground.
This comming week, we'll start pulling the electrical. I'm gonna start with the low voltage. any advice?
The roof is complete, the exterior doors and windows are in and the shell is wrapped!
http://img.photobucket.com/albums/v473/tukwut/IMG_0142_1.jpg
and I was requested to post a pic with me in it for perspective...
http://img.photobucket.com/albums/v473/tukwut/IMG_0154_1.jpg
Some of the big news, we purchased a 5th wheel to have a friend stay on site and guard it for us...
http://img.photobucket.com/albums/v473/tukwut/IMG_0038_1.jpg
And this past week, we got the 3/0 main feed in conduit in the ground and run from the 400amp main panel to the 200amp panel on the house....
http://img.photobucket.com/albums/v473/tukwut/IMG_0179.jpg
That is some thick nasty cable and at nearly 600 total feet, not cheap! It's three runs at 190 feet and one #4 as the ground.
This comming week, we'll start pulling the electrical. I'm gonna start with the low voltage. any advice?